Skip to content
EnerBuild

Industrial solar

Solar plants for factories and warehouses

From 50 kW rooftops to multi-MW ground-mounted plants. Reduce your biggest overhead with engineered solar systems, available on CAPEX or zero-investment PPA models.

Manufacturing unitsWarehouses & logisticsCold storageTextile & spinning millsFood processing

Get a free quote

We call back within one working day.

We only use your number to reply to this enquiry.

Benefits

Why it makes sense

Big savings on power cost

Power is often among the top three costs in manufacturing; solar brings it down for 25 years.

Use idle roof and land

Large factory sheds and unused land become productive energy assets.

Hedge against tariff hikes

Lock in a predictable energy cost while grid tariffs keep rising.

Meet ESG targets

Reduce carbon emissions and meet buyer and export compliance requirements.

Options

Choose what fits you

We'll recommend one after the site visit. Here's how they compare.

Most chosen

Rooftop plants

Metal-sheet, RCC and industrial shed roofs, with structures engineered for wind load.

  • 50 kW – 2 MW
  • Sheet & RCC roofs
  • Walkways & safety lines
  • Net/gross metering

Ground-mounted plants

For sites with open land. Fixed-tilt or seasonal-tilt structures for maximum yield.

  • 500 kW+
  • Higher yield
  • Captive or group captive
  • Open access options

PPA / RESCO

Zero capital investment. Pay per unit at a tariff lower than the grid for the agreement period.

  • No CAPEX
  • Savings from day one
  • O&M included
  • Long-term contract

Process

How we deliver

  1. 1Load study and 12-month bill analysis
  2. 2Detailed site survey and structural assessment
  3. 3Design with PVsyst generation report
  4. 4Approvals, CEIG and DISCOM liaison
  5. 5EPC execution with safety compliance
  6. 6Commissioning, SCADA monitoring and O&M

FAQ

Common questions

Short answers to what customers ask most about this.

Can my roof handle the load?

We do a structural assessment. Metal roofs typically need 12–15 kg/sq m; we design accordingly.

What is open access?

It lets you consume solar power generated at another location through the grid, subject to state regulations and load criteria.

How long does a 500 kW project take?

Typically 8–12 weeks from order to commissioning, depending on approvals.

See what solar would save on your roof

Send us a recent EB bill and your address. We'll visit, measure the roof and give you a written quote. The survey is free, with no obligation.

Call now WhatsApp